Commissioning and Start up

One of the most critical phases during the construction of a project is the time duration between the pre-commissioning of the analyzer system and the Start-up of the process.

This stage of the project aims at validating the integrity of the design and ensuring that an operational, reliable process be handed over to the customer, while meeting their satisfaction.

Projeco Services areuniquely equipped to carry out start-up activities, and troubleshoot associated problems during commissioning.Our engineers execute the services in a planned and methodical manner, and are dedicated to keepingyour project on schedule whilst maintaining the best interests of all parties as the main objective.

Projeco Services have successfully completed a number of project start-up and commissioning activities for majorcompanies in the Middle East and can provide a comprehensive set of services, guiding you in every step of the way.

Start Up Services Include:

  • Verification of As Built documents and site acceptance testing/witnessing.
  • Inspection and verification of system design relative to application, site conditions and stream composition (sampling system, Housing HVAC/Safety Systems, analyzers and utilities, Communication and Networking through to Host).
  • Calibration and hot commissioning with process samples
  • Generation of detailed performance reports(calibration, repeatability, recommendations for performance improvement).